Science & Tech 19 Apr 2026

Foundation Stone Laid in Bhubaneswar for India's First 3D Semiconductor Packaging Unit

Odisha laid the foundation stone in Bhubaneswar on 19 April 2026 for India's first advanced 3D semiconductor packaging unit, a Rs 1,943.53 crore project by 3D Glass Solutions Inc. The facility will use glass-substrate 3D heterogeneous integration to support AI, 5G/6G, defence electronics and automotive radar.

upsc ssc banking state_pcs

On 19 April 2026, the foundation stone for India's first advanced 3D semiconductor packaging unit was laid at Info Valley in Khordha district near Bhubaneswar, Odisha. Odisha Chief Minister Mohan Charan Majhi and Union Minister for Electronics and IT Ashwini Vaishnaw performed the ground-breaking ceremony for the project, which will be implemented by US-based 3D Glass Solutions Inc through its Indian subsidiary, Heterogenous Integration Packaging Solutions Pvt Ltd (HIPSPL).

The total project cost is Rs 1,943.53 crore. The Centre will provide fiscal support of around Rs 799 crore under the India Semiconductor Mission, while the Odisha government will contribute around Rs 399.5 crore. Unlike traditional packaging that uses organic substrates or silicon, this facility will use glass substrates to vertically stack and connect chip components — a technique known as 3D Heterogeneous Integration (3DHI). Glass offers a lower dielectric constant than silicon, which improves signal speed and integrity in advanced chips.

Once fully operational, the plant is projected to produce around 70,000 glass panels, 50 million assembled units and 13,000 advanced 3DHI modules per year. Commercial production is targeted for August 2028, with volume output by August 2030. The facility is expected to create around 2,500 direct and indirect jobs and will supply chips for artificial intelligence, high-performance computing, 5G/6G telecom, automotive radar, defence electronics and aerospace.

For India, the unit is a step toward reducing dependence on chip imports — currently a major strategic and current-account vulnerability. Odisha now becomes the only Indian state hosting both a compound semiconductor fabrication unit and a 3D glass substrate packaging unit on the same campus, strengthening its case as an emerging semiconductor hub alongside Gujarat and Tamil Nadu.

Exam angle: This story links to the India Semiconductor Mission, advanced packaging (OSAT, ATMP, 3DHI), the 'Make in India' electronics push, and centre-state co-financing of industrial projects. UPSC GS-3 (science & tech, infrastructure, indigenisation), SSC and Banking GA can ask about the location, the company, the investment figure or the technology.

Key Points to Remember

  • Foundation laid on 19 April 2026 at Info Valley, Khordha district, near Bhubaneswar, Odisha.
  • Total project cost: Rs 1,943.53 crore. Centre's share around Rs 799 crore; state share around Rs 399.5 crore.
  • Implemented by 3D Glass Solutions Inc (US) via Indian subsidiary Heterogenous Integration Packaging Solutions Pvt Ltd (HIPSPL).
  • Technology: 3D Heterogeneous Integration (3DHI) using glass substrates instead of organic or silicon substrates.
  • Annual targeted output: ~70,000 glass panels, 50 million assembled units, 13,000 3DHI modules.
  • Commercial production by August 2028; volume production by August 2030; ~2,500 direct and indirect jobs.

Exam Relevance

Useful for UPSC GS-3 (industrial policy, science & technology), SSC and Banking GA — combines semiconductor technology, India Semiconductor Mission and centre-state cooperation.

UPSC SSC BANKING STATE_PCS
semiconductors India Semiconductor Mission Odisha 3D packaging electronics Make in India